Welcome Guest [Log In] [Register]
Welcome to Shaiya Beginning. We hope you enjoy your visit.


You're currently viewing our forum as a guest. This means you are limited to certain areas of the board and there are some features you can't use. If you join our community, you'll be able to access member-only sections, and use many member-only features such as customizing your profile, sending personal messages, and voting in polls. Registration is simple, fast, and completely free.


Join our community!


If you're already a member please log in to your account to access all of our features:

Username:   Password:
Add Reply
types of flooring
Topic Started: Oct 16 2017, 08:11 PM (32 Views)
happywork


<p>length of the floor required for the first row of tail, set aside 8 to 12 mm after the expansion joints, saw off the excess. Saw less than 300 mm length of the floor as the second row of the floor of the blank, adjacent two rows of short joints between the floor is not less than 300 mm. The long side of the floor and the ground to maintain the </p>
<p>appropriate angle into the slot, gently press to lock the floor. Geothermal floor: the basic installation method with the above two types of flooring, the difference is: ground moisture content should be ¡Ü 10%, or should be its natural air-drying, or heating and ventilation measures to speed up its drying rate. The use of the mat should be easy to </p>
<p>heat, insulation, anti-aging. After the floor is installed, the surface temperature of the winter floor should not exceed 27 degrees. G, the pavement process requires the installation of the floor, the door and the door must be set to the corresponding height, to ensure the installation of the floor, or need to saw the door and the door. In the </p>
" spacing installing composite decking , Veranda clearance fencing , how to add a permanent bench to the end of a deck , deck boards from recycled plastic "
Offline Profile Quote Post Goto Top
 
« Previous Topic · Class Discussions · Next Topic »
Add Reply